Skip Navigation Website Accessibility
info@nutsandboltsfabric.com
Ph: 605.662.5758
 

2017 Row x Row - Rails to Trails KIT

   
Quantity:    
Notes:    

If we do not have the full amount that you ordered of this item:    
 

Add to Cart
2017 Row x Row - Rails to Trails KIT. Pattern included. Kits & Patterns are only available by visiting the shop.  Patterns & Kits will become available Nov. 1, 2017, on line.  Kits include Laser Cut Appliques.  This includes the Covered Bridge, Horse & Rider, Bicycle & Angle Trail Path. First quality Hoffman Batik & Quilting Treasures Fabric. Laser Cut Appliques, by Red Rooster Laser Arts, Casper, Wyo.

ON THE GO ~ ROW BY ROW 2017 ~ NUTS & BOLTS FABRIC ~ 401 2ND AVE ~ EDGEMONT, SD, 605-662-5758

Edgemont boosts the ONLY hand built covered bridge in SD! The bridge is located in the city park which is “Mile Post 0” for the Mickelson Trail.

The George S. Mickelson Trail is a rail trail in the Black Hills region of South Dakota.

Mile Post “0” starts in the Edgemont City Park. Edgemont is the host of several Mickelson Trail events

The main trail route extends 108.8 miles (175.1 km), from Edgemont to Deadwood, with approximately nine miles of additional branch trails, including a three-mile (5 km) paved link from Custer to the Custer State Park completed in 2007. Intermediate points along the route include the towns of Custer and Hill City, and a short branch provides access to the city of Lead.

Almost all of the trail follows the route of an abandoned railroad branch line constructed by the Chicago, Burlington and Quincy Railroad in 1890-91 and last operated by the Burlington Northern Railroad in 1983 (known by locals as the “Highline”). The trail's route is mountainous, forested, and scenic, traversing the heart of the Black Hills and largely within the boundaries of the Black Hills National Forest, although there are parts of the trail that pass through privately owned land, where trail use is restricted to the trail only. The trail alignment includes four tunnels and more than 100 converted railroad bridges. There are fifteen established trailheads spaced along the route, all of which include vehicle parking, self-sale trail pass stations, vault toilets, and tables. The trail surface is packed crushed limestone and gravel.[2]

The trail is maintained by the South Dakota Game, Fish and Parks Commission. The first segment of the trail was opened in 1991, and the entire route was completed in 1998, and is the first rails to trails project in South Dakota. The trail is named after George S. Mickelson, the South Dakota governor who helped spearhead the project.




 

CONTACT US


 info@nutsandboltsfabric.com

(605) 662-5758

401 2nd Ave.
       Edgemont, SD 57735

Winter Hours
(September ~ May)
Tue - Fri: 10am to 5pm
Saturday - 9am to Noon (or by appointment)
Summer Hours
(June ~ August)
Mon - Fri: 10am to 5pm
Saturday - 9am to Noon (or by appointment)

ONLINE OPEN ~ 24/7


Please call if you are looking for something you don't see on the website-we may have it in the shop!

Thank you for shopping with us. Remember shipping charges may be less than quoted, such as with patterns.